D. On getting the saturation level the drilling bit is taken out with casing retained within the borehole. The grout is then pumped through a hollow steel stem into both equally ends on the casing. The stem is uncovered and crammed with grout. Put up-grouting within the bond duration can https://googlemap48046.blogdon.net/everything-about-micropile-solves-the-problem-of-subsidence-46657721