Prior to hardening of the principal grout, related grout is injected the moment by using a sleeve grout pipe in a stress of a nadir of 1.0MPa. With hollow-stem auger drilling, a steel drill string is used to drill all the way down to the depth of the rotary table. https://ricardosnfyr.jts-blog.com/30741401/piling-fundamentals-explained