The initial park features a capability of 200 MW even though Sandrini II contains a potential of a hundred MW. The whole expense of each assignments were not disclosed on the other hand, during development, over 200 employees ended up utilized. The tasks are expected to determine A few positions https://solarinstallernearme.blogspot.com/2024/12/how-to-save-more-on-your-monthly-energy.html